Plans have been revealed yesterday in Dubai for the world's first fully functional 3D printed building, an ambitious move that will establish the UAE's position as the global centre of technology in architecture, construction and design.
Speaking on the occasion, Mohamed Al Gergawi, Chairman of the UAE National Innovation Committee, said that the UAE aims to deploy the latest technologies to improve people's lives and to develop its economy in line with the country's National Innovation Strategy and the vision of His Highness Sheikh Mohammed bin Rashid Al Maktoum, Vice President and Prime Minister and Ruler of Dubai.
"This project reflects the vision of our leadership here in Dubai," Al Gergawi said. "We are keen to use the latest technologies to simplify people's lives and to serve them better. This project is part of our overall innovation strategy to create new designs and new solutions in education, healthcare and cities. Our goal is to increase the happiness and wellbeing of our residents and to pioneer new solutions for the world.
"The idea of 3D printing buildings was once a dream, but today it has become a reality," he added. "This building will be a testimony to the efficiency and creativity of 3D printing technology, which we believe will play a major role in reshaping construction and design sectors. We aim to take advantage of this growth by becoming a global hub for innovation and 3D printing. This is the first step of many more to come."
Experts estimate that 3D printing technology can reduce the production time of buildings by 50 to 70 percent, reduce labour costs by 50 to 80 percent, and can save between 30 and 60 percent of construction waste. These savings translate to enhanced productivity, higher economic return, and increased sustainability.
The ‘Office' will be approximately 2,000 square feet in size and will be printed layer-by-layer using a 20-foot tall 3D printer, then assembled on site in Dubai in just a few weeks. All interior furniture, detailing, and structural components will also be built using 3D printing technology, combining a mixture of Special Reinforced Concrete, SRC, Glass Fibre Reinforced Gypsum, GRG, and Fibre Reinforced Plastic, FRP. This combination will make it the most advanced 3D printed structure ever built at this scale and the first to be put into actual use.
The building is the result of a partnership between Dubai and WinSun Global, along with leading global architecture and engineering firms Gensler, Thornton Thomasetti, and Syska Hennessy.
In addition to prototyping new technology, the ‘Office' reflects the latest input from experts and researchers in workplace design and the future of work. Located at a busy intersection in the heart of Dubai, the ‘Office' is designed to bring together different professionals, community members, and experts through a mix of public events. The space is open and flexible, allowing for a range of uses and team sizes. It will also feature a small digital fabrication facility and a 3D printing exhibition space.
The project is the first major initiative of the Museum of the Future, launched earlier this year by His Highness Sheikh Mohammed. It highlights the Museum's model of industry-government-designer collaboration, which is intended to develop and deploy cutting edge prototypes across the city of Dubai. It will act as the temporary headquarters for the staff of the Museum of the Future while the permanent museum is being built.
Source: WAM
GMT 14:11 2018 Tuesday ,11 December
Cosmonauts will use special water during long space missionsGMT 15:32 2018 Monday ,03 December
Russian spacecraft with new crew gets into near-Earth orbitGMT 16:21 2018 Tuesday ,27 November
Russia ranks fourth worldwide for number of scientistsGMT 13:32 2018 Monday ,19 November
Launch of first Jordanian nano- satellite dubbed (JYI-SAT) postponedGMT 11:12 2018 Thursday ,15 November
China Focus: Scientists warn of less water supply over melting glacier after 2060GMT 10:16 2018 Wednesday ,31 October
Emirati-made satellite "KhalifaSat" reinforces UAE’s stature in space arenaGMT 08:36 2018 Monday ,29 October
Israeli, Finnish scientists win 1 mln USD for innovation in alternative fuelsGMT 16:39 2018 Tuesday ,23 October
Failed launch of Soyuz-FG did not pause probe into hole in Soyuz MS-09 spacecraftMaintained and developed by Arabs Today Group SAL.
All rights reserved to Arab Today Media Group 2021 ©
Maintained and developed by Arabs Today Group SAL.
All rights reserved to Arab Today Media Group 2021 ©
Send your comments
Your comment as a visitor