Damascus - Sana
Oil pumping resumed on Friday morning in the pipeline linking al-Omar field and al-Taim station in Deir Ezzor province which was set on fire last Tuesday. Saeed Hneidi, Head of the Board of Directors of al-Furat Petroleum Company, told SANA that oil pumping was resumed after required repairs and tests were done to the pipeline.