File of passenger terminal no 2 at Cairo airport referred to ACA

Aviation Minister Hossam Kamal referred a full report about the passenger terminal no. 2 at Cairo International Airport to the Administrative Control Authority (ACA) .

The experimental opening of the passenger terminal no. 2 is scheduled on March 31, 2016.

Kamal, meanwhile, said that he sent the full report to the ACA to probe reasons behind the delay of finalizing the establishment of passenger terminal no. 2.